Construction planning and project controls, explained.
Practical notes on scheduling, billing, cost control and delay evidence. General information, not legal or contractual advice.
RA Bill vs BOQ: How to Reconcile Quantities and Avoid Payment Disputes
Most payment disputes start as small quantity, unit or cumulative-figure differences between the bill, the BOQ and the measurement records. This guide sets out a repeatable reconciliation method and the checks that catch the common errors before a bill is submitted or certified.
Delay & EOTExtension of Time Claims: The Schedule Evidence a Contractor Needs
An EOT claim succeeds or fails on its evidence long before anyone argues about method. This guide sets out the notices, programmes and records a contractor should have in hand, and how analysis methods in the SCL Protocol and AACE RP 29R-03 depend on them.
Planning & SchedulingPrimavera P6 Schedule Health Check: 12 Checks Before You Submit a Baseline
Twelve checks to run on a native P6 file before the baseline goes to the client or consultant: logic, relationships, lags, constraints, float, durations, calendars, critical path, resources, dates, scheduling options and baseline integrity.