Planning & Scheduling

Microsoft Project programmes
with clear dependencies

Practical, readable schedules for teams that work in Microsoft Project, built on real logic and kept up to date.

Enquire about this serviceAll services
Overview

Why this matters

Many contractors, fit-out teams and specialist subcontractors run their programmes in Microsoft Project. The tool is fine; the problem is usually missing logic, manual dates and no progress tracking.

RAYYAF builds or repairs MS Project schedules so that dependencies drive the dates and progress can be measured.

What you receive

Deliverables, defined

Baseline programme

Task hierarchy, dependencies, lags, calendars and constraints used with care, with a saved baseline.

Progress tracking

Percent complete, actual dates and baseline-versus-current comparison each reporting period.

Look-ahead and short-term plans

Extracts for site teams and subcontractor coordination.

Programme reports

Simple Gantt, milestone and variance reports for management.

P6 cross-check or conversion

Where a client needs Primavera P6, we check the conversion and flag anything that changes meaning.

Schedule repair

Fixing manual dates, missing links and unrealistic constraints in an inherited file.

How we work

From first call to delivery

01

Review inputs. Contract dates, scope and the current file.

02

Build or repair logic. Dependencies replace typed-in dates.

03

Baseline. Save the baseline once the programme is agreed.

04

Track progress. Update actuals and compare to baseline each period.

05

Report. Variance and look-ahead outputs for your team.

What we need from you
  • Scope, milestones and contract dates
  • Existing MPP file, if any
  • Working calendars
  • Progress data for each update
Method and standards

Critical Path Method with dependency-driven dates; constraints and manual scheduling are limited and documented. Baselines are saved and never overwritten.

Boundaries

What we do not do

RAYYAF is a project controls consultancy. We do not give legal advice, we do not certify or sign off on behalf of an engineer or authority, and we cannot promise any outcome. Fees are confirmed only in a written proposal.
Who you work with

Founder-led

Mohd Faisal Afatab, Founder. 14+ years in construction planning and project controls on projects in India, the UAE and Egypt. Member, Construction Management Association of America (CMAA).

Markets: India · UAE · Saudi Arabia · Qatar · Oman. Remote engagements across other regions.

FAQ

Common questions

Can you convert between MS Project and P6?

We can support a conversion and check what changed. Some features do not map exactly between the two tools, so we list differences.

Do you only build new schedules?

No. Repairing and updating an existing schedule is common work.

Is MS Project enough for a large project?

For many programmes, yes. For large or contractual-claim projects, Primavera P6 is often preferred. We advise on the right tool for your contract.

Tell us about your project

Send the basics. We reply with questions and a scope outline. Fees are confirmed in a written proposal.

Request a consultation